Wonji Shoa Sugar Factory Ltd., Ethiopia

Supply, installation and commissioning of complete 31.5 MW cogeneration power plant with extraction cum condensing turbine and steam boiler of design capacity 2×130 tph, 65 barg, 510 °C with travelling grate combustor capable of firing bagasse.

Most Recent References

power plant engineering consultants

Engineering Services

power plant Contract manufacting

Contract Manufacturing

operation and maintenance for power plants
Retrofitting and revamping solutions